Software testing or trial runs are part of the software life cycle and stages of software development, and its technical approval for production. The automation test consists in the implementation and use of software technologies for the partial or total construction of repeatable and consistent test cases, with the objective of cutting down software testing time and costs.
 
 

Design phases are explained below:

Test Planning & Controlling
•   Test planning: definition of objectives and specifics for the testing activity
•   Test control: continuous confrontation phase between planning and the state of advancement, documenting the current state and highlighting the flaws of what has been planned.

Test Analysis & Design
•   Analysis and design of the tests and activities where objectives are transformed in appropriate “test condition” and “test case”

Test Implementation & Execution
•   The implementation and execution are activities where the “test procedure” (and the eventual script) are specified by combining “test case” in a particular order including other necessary information for the execution.

Evaluation Exit Criteria & Reporting
•   The evaluation of exit criteria and activities where the test execution is evaluated with respect with the defined objectives

Test Closure
•   Conclusion of tests consists of the collection of data produced by the test activities aimed at evaluating the results statistically.

APPROACH METHODOLOGY
SIDE SOFT, engaged by the client for a migration project of sharepoint 2013 has activated a test factory for the verification of the new software, for both the single release in the test environment and for the execution of the user acceptance testing (uat) in a testing environment with the end user.
thanks to the competences side soft accumulated internally, it used the necessary automatisms to carry out tests for the following software:
•   JMeter
•   SoapUi
•   SilkTest
•   Visual Studio Web Performance and Load Tests

to be specific, the following activities are necessary:

Book of Tests
•   Identify and design test cases appropriate for the verification of the software to be tested

Preparation of data for case tests
•   insertion in the data base and in other structures involved necessary data for the execution of written test cases

Application maintenance and management of technological environments
•   bug verification and eventual solution

Execution of test cases in test areas for an adequate number of repetitions for each process

Execution of pre-uat tests and support user in the execution of the uat

Bug tracking
•   census of bugs detected and the certification of workflow correction and verification

Support for per baby-sitting and trouble shooting

Handovers to the client’s work group

Other applicable areas for the solution:
•   New software test
•   Stress test
•   Non-regression test